Project List for Thermal Insulating Coating Products
- Separator Tanks -PT.Pertamina EP Field Jatibarang-Region Jawa, Cirebon -2008
- PHO Units – PT. Asia Pacific Fiber Tbk-Kendal Semarang – 2009
- PHO Unit – PT SK Fiber , Karawang Timur -2009
- Pipa transfer Geothermal Dieng – PT Geo Dipa 2009
- Casing pompa G2 – Hydrocracker plant – PT.Pertamina (Persero) RU V-Balikpapan -2010
- Exhaust pipe Glass Float – PT. Mulia Glass Float- Cikarang- Bekasi 2010
- Spin Beams – PT Asia Pacific Fiber Tbk, Kendal Semarang – in progress 2011
- Catalyst Cooler Superheater- PT.Pertamina(Persero) RU VI,Balongan – 2012
- HPCC heat Exchanger – PT.Pupuk Kalimantan Timur , Bontang – Kaltim 2011
- Chips Top Hoppers , PT.Asia Pacific Fibers, Tbk – Semarang 2016
Project List for TEC Coatings
- Pipeline 20” Tempino- Plaju 3 KM , PT Pertagas 2011
- Underground Pipeline 8”; 4” – 1000 M – PT MuliaGlass, Cikarang in progress 2011
- Clean water tank , Sedimentation Pond,9000 M² – PT Pertamina(Persero) RU IV,Cilacap in progress 2011
- Crude oil roof tank repair – PT Pertamina(Persero) RU IV, Cilacap 2011
- Condensate roof tank repair – PT Pertamina Ep Field Prabumulih – Palembang 2011
- Crude Oil pipeline Mundu Balongan – PT Pertamina EP Field Jatibarang Region Jawa 2011
Project List for PRT Aquawrap & Constrictor Composite
- Booster pipe 48” – 20 M – PT Pertamina EP Field Jatibarang Region Jawa 2008
- Internal tank repair & strengthenning ,2 unit Condensate tank – PT Moeladi 2008
- Outlet pipe 42” tank T-001 – PT Pertamina EP Field Jatibarang Region Jawa 2008
- Crude oil Pipeline 30” – 200 M – PT Pertamina EP Field pangkalan Susu-Medan 2008
- Loading pipeline terminal Teluk kabung 3000 M –PT Pertamina Pemasaran dan Distribusi region-I Sumatra.
2008. - Pipeline repair & strengthenning- Terminal Tanjung Uban, Batam- PT Pertamina Pemasaran dan Distribusi region I- Sumatra. 2008.
- Online LPG Pipe repair – PT.Pertamina(Persero) RU VI, Balongan –Indramayu 2011
- Perimeter beam strengthenning Project 20 lt- Senayan City – Jakarta 2009
- Beam strengthenning project-LTC Hayam Wuruk – Jakarta 2009
- Beam strengthenning project – Bellezza Apartment – Jakarta2009
- Roof tank repair 500 M² – PT Pertamina(Persero) RU IV Cilacap 2011
- Roof tank Repair 30 M² – PT Pertamina EP Field Prabumulih 2011
- Pipeline strengthenning Tempino-Plaju ,3000 M – PT Pertagas 2011
- Online Pipe 24” leak repair – PDAM Cirebon 2011
Project list for AKS Sheet membrane , Geomembrane & GCL
- Pond Linning 70,000 M² w/ Geomembrane – PT Panasia PowerPlant- Bandung 2007
- Amonia waste pond 4000 M² w/ Geomembrane‐ PT Pupuk Kujang 2010
- Aeration pond & Equalization Pond 5.500 M² w/ AKS sheet – PT.Pertamina (Persero) RU IV,Cilacap 2011 ( sub kontrak dari PT. Elnusa)
- Soil Protection w/GCL 2,400 M² – Dahana Subang – PT Pembangunan Perumahan 2011
- SWB Concrete protection Liner AKS di PT.Pertamina RU-V, Balikpapan 2015
- Project list for AKS Sheet membrane , Geomembrane & GCL. SWXZ & Equalization Pond repair dan lining Dengan AKS,
- PT.Pertamina(Persero) RU-V, 2016
Project list for Konusit KK-10 & MC Bauchemie Products
- Sulphur Pit – PT.Pertamina(Persero) RU VI,Balongan 2009
- Effluent water treatment plant – PT.Pertamina(Persero) RU V- Balikpapan 2009
- Support LPG Tank repair – PT.Pertamina(Persero) RU V- Balikpapan 2009
- Improve leakage on concrete house of Mr. Umar-Bandung 2010
- Improve leakage on swimming pool concrete – Mr Billy – Bandung 2010
- Improve leakage on the concrete house of Mr. Kuntoro – Bandung 2010
- Improving leakage of concrete home of Mr. Ricky-Bekasi 2010
- Improve the leakage slit of RFCC equalization, PT.Pertamina RU-IV, PT.Adhi Karya 2014-2015
Project List for Albi Clad-800, Intumescent Fireproofing
- Cross Country Pipeline Project ,PT Pertamina RU-IV, Cilacap 2014
- Struktur in BalikpapanI, PT Pertamina RU-V, Balikpapan 2015